In construction, a floor void is typically a vertical opening or hole that is left in the floor construction either to accommodate services, or allow the installation of a staircase or, as an aesthetic feature.
When services such as pipework, ducts and cables are required to penetrate vertically through a floor construction, a void must be created at the time of construction otherwise costly and disruptive remedial work must be undertaken. To avoid this, architects and engineers usually delineate on their drawings where floor voids are to be located.
With in-situ-poured concrete floors, voids need to be trimmed (with appropriate reinforcement within the floor thickness) around the opening and the necessary formwork installed to create the size and shape of void required. When the concrete is poured and the formwork eventually removed, a void remains.
Small vertical holes can be formed not only by timber boxes, which are usually removed after casting, but also by other materials such as polystyrene and stiff cardboard, which may be left in position.
Sometimes, when no provision for a void has been made, and the concrete has been poured, it is possible (for small service voids), to cut the holes after the concrete is cast. However, this is uneconomical and disruptive.
With precast concrete planks and beams, depending on the size of the void, special factory-made units can incorporate a hole in the beam or plank; alternatively, for larger voids, a system of shorter planks and mild steel supporting straps or trimming beams can be used to ‘trim’ around the edge of the void.
It is generally regarded as good practice not to locate voids too close to columns and beams.
Larger voids within floors can be left for architectural reasons, eg to allow a visual link between two floors, as might be used in a reception area or atrium to open-up the space.
The term floor void can also be used to refer to the horizontal space between a ceiling and the floor above, which may accommodate the floor structure, services and so on. It may also refer to the void between the bottom floor of a building and the ground below, sometimes referred to as a crawl space.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.