Floor void
In construction, a floor void is typically a vertical opening or hole that is left in the floor construction either to accommodate services, or allow the installation of a staircase or, as an aesthetic feature.
When services such as pipework, ducts and cables are required to penetrate vertically through a floor construction, a void must be created at the time of construction otherwise costly and disruptive remedial work must be undertaken. To avoid this, architects and engineers usually delineate on their drawings where floor voids are to be located.
With in-situ-poured concrete floors, voids need to be trimmed (with appropriate reinforcement within the floor thickness) around the opening and the necessary formwork installed to create the size and shape of void required. When the concrete is poured and the formwork eventually removed, a void remains.
Small vertical holes can be formed not only by timber boxes, which are usually removed after casting, but also by other materials such as polystyrene and stiff cardboard, which may be left in position.
Sometimes, when no provision for a void has been made, and the concrete has been poured, it is possible (for small service voids), to cut the holes after the concrete is cast. However, this is uneconomical and disruptive.
With precast concrete planks and beams, depending on the size of the void, special factory-made units can incorporate a hole in the beam or plank; alternatively, for larger voids, a system of shorter planks and mild steel supporting straps or trimming beams can be used to ‘trim’ around the edge of the void.
It is generally regarded as good practice not to locate voids too close to columns and beams.
Larger voids within floors can be left for architectural reasons, eg to allow a visual link between two floors, as might be used in a reception area or atrium to open-up the space.
The term floor void can also be used to refer to the horizontal space between a ceiling and the floor above, which may accommodate the floor structure, services and so on. It may also refer to the void between the bottom floor of a building and the ground below, sometimes referred to as a crawl space.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.